INOVASI DAN SENI PADA VALUE ENGINEERING UNTUK PENGELOLAAN KONSTRUKSI

Kazan Gunawan

Abstract


The success of a project is often evaluated on the basis of the cost amount the project has spent and the punctuality of completing the project. In effect, such aspect as how the project executor is able to interpret the asset user’s interest to do his/her business activities successfully in the project is frequently unobserved. This project executor’s interpretation ability can be seen from the project design he/she creates to meet his/her customer’s satisfaction, for example comfotable atmosphere and function fulfilment of the project. Therefore, to enable an architecture meets the customer up-to-date needs, the enhancement of the Value engineering and innovation to find the lowest cost, easy to implement, and fast method is needed. Monte Carlo Simulation has been used for explaining the method.

Full Text:

PDF

References


Brown J.A, “15 Keys for Successful Construction, Estimating and Bidding Transaction of AACE Internasional”, AACE International, 1998.

Yuan, LL and Pheng, LS, “Just-in-Time Productivity for Construction”, National Prints, Singapore, 1992.

Soeparto, H.G, “Pengelolaan Proyek Konstruksi Kini dan Masa Mendatang”, Trend Teknik Sipil, JONBI, 2002.

Back WE and Boles, WW, “Defining Triangular Probability Distribution From Historical Cost Date”, Journal of Construction Engineering and Management, 2000, pp 29-37.

Clarke, DE, “Monte Carlo Analysis = Ten Years of Experience”, Technical Article-Roll of RiskSeries 43, 2001.

Latief Y dan Nurzaman, L “Simulasi Waktu & Biaya Menara BTS di Propinsi Banten Dengan Program PERTMASTER”, Jurnal HAKI,Vol. 6 No.1, Mei 2005.











View My Stats

Creative Commons License
This work is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.