[1]
Zhang, Y., Wang, F., Fu, F. and Su, Z. 2018. Multi-AGV Path Planning for Indoor Factory by Using Prioritized Planning and Improved Ant Algorithm. Journal of Engineering and Technological Sciences. 50, 4 (Oct. 2018), 534-547. DOI:https://doi.org/10.5614/j.eng.technol.sci.2018.50.4.6.