[1]
Mardin, F. and Dekker, R. 2016. Simultaneous Optimization of Block Replacement and Spare Part Ordering Time for a Multi Component System with Separate Spare Part Ordering for Block and Failure Replacements. Journal of Engineering and Technological Sciences. 48, 5 (Nov. 2016), 495-522. DOI:https://doi.org/10.5614/j.eng.technol.sci.2016.48.5.1.