[1]
Wibowo, A. 2011. Metodologi Perhitungan Required Rate of Return berdasarkan Cumulative Prospect Theory: Studi Kasus Proyek Investasi Jalan Tol. Jurnal Teknik Sipil. 18, 2 (Aug. 2011), 1-12. DOI:https://doi.org/10.5614/jts.2011.18.2.1.