Wibowo, A. (2011). Metodologi Perhitungan Required Rate of Return berdasarkan Cumulative Prospect Theory: Studi Kasus Proyek Investasi Jalan Tol. Jurnal Teknik Sipil, 18(2), 1-12. https://doi.org/10.5614/jts.2011.18.2.1