Wibowo, Andreas. 2011. “Metodologi Perhitungan Required Rate of Return Berdasarkan Cumulative Prospect Theory: Studi Kasus Proyek Investasi Jalan Tol”. Jurnal Teknik Sipil 18 (2):1-12. https://doi.org/10.5614/jts.2011.18.2.1.