Delimar, Lativa, and R. Pamekas. 2020. “Faktor-Faktor Keterlambatan Pelaksanaan Proyek Gedung Hotel Alila Jakarta”. Jurnal Teknik Sipil 27 (2):177-84. https://doi.org/10.5614/jts.2020.27.2.8.