Wibowo, A. (2011) “Metodologi Perhitungan Required Rate of Return berdasarkan Cumulative Prospect Theory: Studi Kasus Proyek Investasi Jalan Tol”, Jurnal Teknik Sipil, 18(2), pp. 1-12. doi: 10.5614/jts.2011.18.2.1.