Wibowo, A. “Metodologi Perhitungan Required Rate of Return Berdasarkan Cumulative Prospect Theory: Studi Kasus Proyek Investasi Jalan Tol”. Jurnal Teknik Sipil, vol. 18, no. 2, Aug. 2011, pp. 1-12, doi:10.5614/jts.2011.18.2.1.