Simultaneous Optimization of Block Replacement and Spare Part Ordering Time for a Multi Component System with Separate Spare Part Ordering for Block and Failure Replacements
DOI:
https://doi.org/10.5614/j.eng.technol.sci.2016.48.5.1Abstract
A block replacement schedule can be optimized simultaneously with a spare parts ordering schedule, since all items are replaced at a constant interval. The solution of joint optimization for spare parts ordering time and block replacement gives lower costs compared to separate optimization of ordering time and replacement time. The spare parts for replacement can be classified as stochastic demand for failure replacement and deterministic demand for block replacement. In this paper, we propose a simulation model for a separate spare parts ordering schedule. The solution was compared to the solution for a model with common spare parts for both failure and block replacement. The system has N identical components, each with a Weibull lifetime distribution. The costs of failure and block replacements, and also the costs of ordering, holding and shortage of spare parts are given. The proposed model was shown to perform better than the common order model. Also, compared to the age replacement model, the solution of the proposed model is relatively similar, yet the economies of scale would be an advantage for the block replacement over age replacement.Downloads
References
Aberdeen Group, Aberdeen Benchmarking Study, The Service Parts Management Report, Boston, United States, 2003.
Smeitink, E. & Dekker, R., A Simple Approximation to The Renewal Function, IEEE Transaction On Reliability, 39(1), pp. 71-75, 1990.
Barlow R.E. & Proschan, F., Mathematical Theory of Reliability, Wiley and Son, New York, United States, 1965.
Osaki, S., Kaio, N. & Yamada, S., A Summary of Optimal Ordering Policies, IEEE Transaction on Reliability, 30, pp. 272-277, 1981.
Park, Y.T. & Park, K.S., Generalized Spare Ordering Policy with Random Lead Times, European Journal of Operations Research, 23, pp. 320 -330, 1986.
Kalpakam, S. & Shahul Hameed, M.A., Optimum Ordering Policies with Random Lead Times, Microelectron Reliability, 21(5), pp. 737-741, 1981.
Acharya, D., Nagbhushanam, G. & Alam, S.S., Jointly Optimal Block Replacement and Spare Provisioning Policy, IEEE Transactions on Reliability, 35(4), pp. 447-451, 1986.
Kaio, N. & Osaki, S., Ordering Policies with Two Types of Lead Times, Microelectronics and Reliability, 16, pp. 225-229, 1977.
Kaio, N. & Osaki, S., Optimum Planned Policies with Minimal Repair, Microelectronics and Reliability, 28(2), pp. 287-293, 1988.
Sridharan, V., Optimum Planned Policies with Minimal Repair and Random Lead Times, Microelectronic Reliability, 32(7), pp. 905-909, 1992.
M.J. Armstrong & Atkins, D.A., Joint Optimization Of Maintenance and Inventory Policies for A Simple System, IIE Transaction 28, pp. 415-424, 1996.
Armstrong, M.J. & Atkins, D.A., A Note on Joint Optimization of Maintenance and Inventory, IIE Transaction, 30(2), pp. 143-149, 1998.
Zohrul Kabir, A.B.M. & Al Olayan, A.S., A Stocking Policy for Spare Part Provisioning under Age-Based Preventive Replacement, European Journal of Operations Research, 90(1), pp. 171-181, 1996
Sarker, R. & Haque, A., Optimization of Maintenance and Spare Provisioning Policy Using Simulation, Applied Mathematical Modeling 24(10), pp. 751-760, 2000.
Horenbeek, A.V., Bure, J., Cattrysse, D., Pintelon, L. & Vansteenwegen, P., Joint Maintenance and Inventory Optimization Systems: A Review, Int. J. Production Economics, 143(2), pp. 499-508, 2013.
Kelton, W.D., Sadowski, R.P. & Sturrock, D.T., Simulation with Arena Third Edition, McGraw Hill, New York, United States, 2004.
Rockwell Software User's Guide, Opquest for Arena User's Guide , 2002
Glover, F., Kelly, J.P. & Laguna, M., New Advances for Wedding Optimization and Simulation, in Simulation Conference Proceeding, 1999 Winter, P.A. Farrington, H.B. Nembhard, D.T. Sturrock, and G.W. Evans, (eds.), pp. 255-260, 1999.
Archibald, T.W. & Dekker, R., Modified Block Replacement For Multiple Components Systems, IEEE Transactions on Reliability, 45(1), pp. 75-83, 1996.
Dekker, R. & Dijkstra, M.C., Opportunity-Based Age Replacement: Exponentially Distributed Times between Opportunities, Naval Research Logistics, 39, pp. 175-190, 1992.