Kajian Eksploratori Hubungan Praktik Komunikasi dan Hasil Proyek Konstruksi di Sumatera Barat
DOI:
https://doi.org/10.5614/jts.2024.31.2.12Keywords:
Construction projects, communication practices, project results, axial factor analysis, West SumatraAbstract
Communication management is considered as an important factor related to performance improvement in construction projects. This study aims to identify and determine communication management practices (CMP) in construction projects correlated to project outcomes (PO). Data were obtained from 209 questionnaires distributed to contractors and consultants in the West Sumatra province. The research questionnaire was divided into two components the respondent's profile and four PMK factors, namely Information and Communication Technology (ICT), Communication Skills and Competence (CSC), Communication Management Plan (CMP) and Team Work (TW). Each factor has 4-5 statement items. In terms of project results, it was seen from the project scope, cost, time, quality and safety level. Data were analyzed using Principle Axis Factoring (PAF). The next analysis was the Spearman correlation to evaluate the relationship between each CMP factor and PO. The results showed that there was a strong positive correlation between the three CMP factors (ICT, CSC and TW) and PO. Conversely, no relationship was found between the CMP factor and PO. The may not be fully generalized due to some limitations. However, it helps construction practitioners to recognize the communication aspects that could be improved and strengthened to increase performance of the project.
References
Aiyewalehinmi, E.O. (2013). Factor analysis of communication in the construction industry. The International Journal of Engineering and Science, 2(10), p.49-57.
Aulich, T. (2013). The role of effective communication in the construction industry: A guide for education and health clients. Australasian Journal of Construction Economics and Building, 13(4), p.92-101. https:// doi.org/10.5130/ajceb.v13i4.3740
Caltrans Project Communication Handbook (2007). Office of Project Management Process Improvement. Department of Transportation, Sacramento, US.
Ceric, A. (2014). Strategies for minimizing information asymmetries in construction projects: project managers? perceptions. Journal of business economics and management, 15(3), 424-440.
Chassiakos, A.P. (2007). The use of information and communication technologies in construction. Scotland: Saxe-Coburg Publication.
Chundawan, E., & Alifen, R. S. (2014). Model Sumber dan Penyebab Rework pada Tahapan Proyek Konstruksi. Jurnal Dimensi Utama Teknik Sipil, 1(1).
Craig, R.T. (2006). Chapter 5: Communication as a practice. [e-book] London: Sage Knowledge Publication.
Creswell, J. W. (2014). Qualitative, quantitative and mixed methods approaches.
?ulo, K. and Skendrovi?, V., 2010. Communication management is critical for project success. Informatol, 43, (3), p.228-235.
Davis, J., Millburn, P., Murphy, T., Woodhouse, M., 2001. Successfull Team Building, Gramedia Jakarta.
DPUPR. (2020). Survey Kepuasaan Masyarakat Dinas Pekerjaan Umum dan Penataan Provinsi Sumatera Barat. Padang: Dinas Pekerjaan Umum dan Penataan Ruang Provinsi Sumatera Barat.
Garbharran, H., Govender, J. and Msani, T. (2012). Critical success factors influencing project success in the construction industry. African journal online, 19(2), p.90-108.
Gunasekaran, A. & Morteza, R. (2016). Visual means as a way of improving communication in construction projects based on observation from the Swedish construction industry. Master?s. Chalmers University of Technology.
Hair, J.F., Jr., Black, W.C., Babin, B.J., Danerson, R.E. & Tatham, R.L. (2010), Multivariate data analysis, 7th edn., Prentice-Hall, Upper Saddle River, NJ.
Harsian, H. S. (2021). Faktor penghambat komunikasi efektif di proyek konstruksi pemerintah dari perspektif penyedia jasa. Tesis di Universitas Bung Hatta, Padang.
Hijazi, W., Ghebeh, A., & Zayed, T. (2008). VRML as an effective communication technique. In CSCE 2008 annual conference.
Hoezen, M. E. L., Reymen, I. M. M. J., & Dewulf, G. P. M. R. (2006). The problem of communication in construction. In CIB W96 Adaptable Conference, University of Twente).
Hoezen, M. E. L., Reymen, I. M. M. J., & Dewulf, G. P. M. R. (2006). The problem of communication in construction. In CIB W96 Adaptable Conference, University of Twente).
Khanyile, N. S., Musonda, I., & Agumba, J. N. (2019). Evaluating the relationship between communication management practices and project outcomes: a case study of Eswatini (Swaziland) construction industry. Construction Economics and Building, 19(2), 197-219.
Khoshtale, O. & Adeli M.M. (2016). The relationship between team effectiveness factors and project performance aspects: A case study in Inranian construction project teams. An international journal of humanities and cultural studies, Special May Issue (2356-5926), p.1738-1767.
Kliem, R.L. (2008). Effective Communication for project management. New York: Aurbach Publication, Taylor & Francis Group
Molwus, J.J. (2014). Stakeholder management in construction projects: A life cycle-based framework. PhD. Heriot Watt University.
Mungeria K. (2012). Professional teamwork and project performance in building construction industry in Kenya. Master?s. University of Nairobi.
Muszynska, K., Dermol, K., Trunk, V., kovic, A., & Smrkolj, G. (2015, May). Communication management in project teams?practices and patterns. In Joint International Conference (pp. 1359-1366).
Naqvi, I., Aziz, S. & Rehman, R. (2011). The impact of stakeholder communication on project outcome. African Journal of Business Management, 6, (14), p.5824-5832.
Ngure, J. N., Kihoro, J. M., & Waititu, A. (2015). Principal component and principal axis factoring of factors associated with high population in urban areas: a case study of Juja and Thika, Kenya. American Journal of Theoretical and Applied Statistics, 4(4), 258-263.
Ofori, D.F. (2013). Project management practices and critical success factors?a developing country perspective. International Journal of Business and Management, 8, (21), p.14. https://doi.org/10.5539/ijbm. v8n21p14
Ogwueleka, A. (2011). The critical success factors influencing project performance in Nigeria. International Journal of Management Science and Engineering Management, 6, (5), p. 343-349. https://doi.org/10.1080/1 7509653.2011.10671182
Olanrewaju, A., Tan, S. Y., & Kwan, L. F. (2017). Roles of Communication on Performance of the Construction Sector. Procedia Engineering, 196(June), 763-770. https://doi.org/10.1016/j.proeng.2017.08.005
Pallant, J., 2013. SPSS survival manual: A step by step to data analysis using IBM SPSS?. 5th ed. Sydney: Allen and Unwin Publication.
Peansupap, V. & Walker H. (2005). Factors enabling information and communication technology diffusion and actual implementation in construction organisations. Journal of Information Technology in Construction, 10(1874-4753), p.193-218
Peli, M., Utama, W. P., Jumas, D. Y., Zulherman, Z., Sesmiwati, S., Ariani, V., Roza, F. & Thaha, P. (2022). Faktor determinasi komunikasi efektif di proyek konstruksi dari perspektif multiple stakeholders. Jurnal Studi Komunikasi dan Media, 26(2), 109-122.
Perumal, R. & Bakar, A. (2011). The need for standardisation of document towards an efficient communication in the construction Industry. ACTA Technica Corviniensis, Bulletin of Engineering, Tome IV (Year 2011) January- March, p.1-8.
Pietroforte, R. (2010). Communication and governance in the building process. Journal of Construction Management and Economics, 10(1), p.71-82.
PMI, Project Management Institute. (2013). A Guide to the Project Management Body of Knowledge: PMBOK Guide: Project Management Institute.
Prabhakar, G.P. (2008). What is project success: literature review? International Journal of Business and Management, 3 (9), p.3-10.
Subramaniam, C., Ismail, S., Mohd, K. Z., Hazwani, N., & Latif, A. (2020). Causative Failure Factors of communications Management in Mixed-use Development Projects in Malaysia. Journal of Critical Reviews, 7(5), 82-86.
Tipili, L., Ojeba, P. & Muhammad, S. (2014). Evaluating the effects of communication in construction project delivery in Nigeria. Global Journal of environment Science and Technology, 2 (5), p.048-054.
Winch, G. M. (2010). Managing Construction projects: an information processing approach. 2nd ed. West Sussex: Wiley-Blackwell.
Yong Cheong, Y. & Mustaffa, E. (2015). Clients, consultants and contractor?s perception of critical success factors for construction Projects in Malaysia.
Zulch, B.G. (2014). "Communication: The foundation of project management." Procedia Technology, 16:1000-1009.