| E-ISSN: 2549-2659 |
| ISSN: 0853-2982 |
| Focus and Scope |
| Author Guideline |
| Peer Review Process |
| Publication Frequency |
| Open Access Policy |
| Payment |
| Style & Layout Guide |
| Publication Ethics |
| Subcription Info |
Vol. 18 No. 2 (2011)
Published:
2016-08-19
Articles
-
Metodologi Perhitungan Required Rate of Return berdasarkan Cumulative Prospect Theory: Studi Kasus Proyek Investasi Jalan Tol
Abstract views:
365 times
|
Downloaded:
525 times
DOI :
https://doi.org/10.5614/jts.2011.18.2.1
-
Metode Memperkirakan Debit Air yang Masuk ke Waduk dengan Metode Stokastik Chain Markov (Contoh Kasus: Pengoperasian Waduk Air Saguling)
Abstract views:
332 times
|
Downloaded:
315 times
DOI :
https://doi.org/10.5614/jts.2011.18.2.2
-
Perilaku Deformasi Pemecah Gelombang Kantong Pasir Tipe Tenggelam
Abstract views:
329 times
|
Downloaded:
225 times
DOI :
https://doi.org/10.5614/jts.2011.18.2.3
-
Development of Bearing Capacity Factor in Clay Soil with Normalized Undrained Shear Strength Behavior using The Finite Element Method
Abstract views:
322 times
|
Downloaded:
818 times
DOI :
https://doi.org/10.5614/jts.2011.18.2.4
-
Kerusakan Bangunan Hotel Bumi Minang Akibat Gempa Padang 30 September 2009
Abstract views:
909 times
|
Downloaded:
371 times
DOI :
https://doi.org/10.5614/jts.2011.18.2.5



