Vol. 18 No. 2 (2011)
Published:
2016-08-19
Articles
-
Metodologi Perhitungan Required Rate of Return berdasarkan Cumulative Prospect Theory: Studi Kasus Proyek Investasi Jalan Tol
Abstract views:
509 times
|
Downloaded:
688 times
DOI :
https://doi.org/10.5614/jts.2011.18.2.1
-
Metode Memperkirakan Debit Air yang Masuk ke Waduk dengan Metode Stokastik Chain Markov (Contoh Kasus: Pengoperasian Waduk Air Saguling)
Abstract views:
414 times
|
Downloaded:
410 times
DOI :
https://doi.org/10.5614/jts.2011.18.2.2
-
Perilaku Deformasi Pemecah Gelombang Kantong Pasir Tipe Tenggelam
Abstract views:
402 times
|
Downloaded:
319 times
DOI :
https://doi.org/10.5614/jts.2011.18.2.3
-
Development of Bearing Capacity Factor in Clay Soil with Normalized Undrained Shear Strength Behavior using The Finite Element Method
Abstract views:
437 times
|
Downloaded:
1018 times
DOI :
https://doi.org/10.5614/jts.2011.18.2.4
-
Kerusakan Bangunan Hotel Bumi Minang Akibat Gempa Padang 30 September 2009
Abstract views:
1053 times
|
Downloaded:
502 times
DOI :
https://doi.org/10.5614/jts.2011.18.2.5



