Vol. 29 No. 2 (2022): Jurnal Teknik Sipil
Articles
-
Higher-Order Finite Difference Scheme With TVD Filter Algorithm. Part 1: Simulations of Scalar Advective Dominant Problems.
Abstract views:
653 times
|
Downloaded:
772 times
DOI :
https://doi.org/10.5614/jts.2022.29.2.1
-
Deformation Analysis on The Wall of Coal Reclaim Tunnel In Binungan, Suaran, Kalimantan Timur Using Terestrial Surveys
Abstract views:
730 times
|
Downloaded:
683 times
DOI :
https://doi.org/10.5614/jts.2022.29.2.2
-
Infrastructure Construction Projects Scheduling Using Manual-Program Evaluation and Review Technique (M-PERT) Method. Case Study: Indonesian Sunda Strait Bridge
Abstract views:
1233 times
|
Downloaded:
1094 times
DOI :
https://doi.org/10.5614/jts.2022.29.2.3%20
-
Studi Alternatif Loss of Prestress PC I Girder Akibat Metode Single Stressing dan Double Stressing pada Section Overpass STA 52+174 Proyek Jalan Tol Balikpapan-Samarinda
- pdf (Bahasa Indonesia)
Abstract views:
1058 times
|
Downloaded:
1008 times
DOI :
https://doi.org/10.5614/jts.2022.29.2.4
-
Pengaruh Perilaku Tinggi Muka Air Tanah dengan Variasi Kemiringan Lereng Terhadap Stabilitas Lereng Berbasis Pemodelan Numerik
- pdf (Bahasa Indonesia)
Abstract views:
2277 times
|
Downloaded:
1574 times
DOI :
https://doi.org/10.5614/jts.2022.29.2.5
-
Analisis Balik Kurva Penurunan terhadap Waktu pada Pekerjaan Reklamasi dengan Metode Elemen Hingga dan Evaluasi Derajat Konsolidasi Tanah Lunak Berdasarkan Hasil Monitoring Settlement Beacon
- pdf (Bahasa Indonesia)
Abstract views:
735 times
|
Downloaded:
745 times
DOI :
https://doi.org/10.5614/jts.2022.29.2.6
-
Transisi Energi Terbarukan di Indonesia: Dinamika Kendaraan Listrik dengan Pendekatan Self-organization di Kota Jakarta
- pdf (Bahasa Indonesia)
Abstract views:
3882 times
|
Downloaded:
3191 times
DOI :
https://doi.org/10.5614/jts.2022.29.2.7
-
Evaluasi Pengaruh Sudut Putaran pada Pemadatan Campuran Beraspal Menggunakan Superpave Gyratory Compactor (SGC) Terhadap Kinerja Fatigue dan Resilient Modulus pada Stone Matrix Asphalt (SMA)
- pdf (Bahasa Indonesia)
Abstract views:
646 times
|
Downloaded:
643 times
DOI :
https://doi.org/10.5614/jts.2022.29.2.8
-
Implikasi Percepatan Konsolidasi menggunakan Prefabricated Vertical Drain (PVD) terhadap Biaya Konstruksi Awal dan Biaya Pemeliharaan Infrastruktur Jalan Tol
Abstract views:
706 times
|
Downloaded:
629 times
DOI :
https://doi.org/10.5614/jts.2022.29.2.9%20
-
Kajian Sistem Manajemen Keselamatan dan Kesehatan Kerja pada Perusahaan Konstruksi Jalan di Indonesia
- pdf (Bahasa Indonesia)
Abstract views:
1506 times
|
Downloaded:
1544 times
DOI :
https://doi.org/10.5614/jts.2022.29.2.10%20



