| E-ISSN: 2549-2659 |
| ISSN: 0853-2982 |
| Focus and Scope |
| Author Guideline |
| Peer Review Process |
| Publication Frequency |
| Open Access Policy |
| Payment |
| Style & Layout Guide |
| Publication Ethics |
| Subcription Info |
Vol. 24 No. 3 (2017)
Published:
2017-12-06
Articles
-
Probabilistic Modeling of Updating Epistemic Uncertainty In Pile Capacity Prediction With a Single Failure Test Result
Abstract views:
217 times
|
Downloaded:
233 times
DOI :
https://doi.org/10.5614/jts.2017.24.3.1
-
Numerical Simulation of Bed Level Changes Around Structure Due to Waves and Current
Abstract views:
272 times
|
Downloaded:
196 times
DOI :
https://doi.org/10.5614/jts.2017.24.3.2
-
Sudut Kontak dan Keterbasahan Dinamis Kayu Samama pada Berbagai Pengerjaan Kayu
Abstract views:
443 times
|
Downloaded:
242 times
DOI :
https://doi.org/10.5614/jts.2017.24.3.3
-
Karakteristik Kekuatan Leleh Lentur Baut Besi dengan Beberapa Variasi Diameter Baut
Abstract views:
580 times
|
Downloaded:
261 times
DOI :
https://doi.org/10.5614/jts.2017.24.3.4
-
Keandalan Menara Televisi Rangka Baja Akibat Beban Gempa
Abstract views:
258 times
|
Downloaded:
194 times
DOI :
https://doi.org/10.5614/jts.2017.24.3.5
-
Analisis Spasial Risiko Banjir Bandang Akibat Keruntuhan Bendungan Alami pada DAS Krueng Teungku, Kabupaten Aceh Besar, Provinsi Aceh
Abstract views:
423 times
|
Downloaded:
367 times
DOI :
https://doi.org/10.5614/jts.2017.24.3.6
-
Substitusi Material Pozolan Terhadap Semen pada Kinerja Campuran Semen
Abstract views:
694 times
|
Downloaded:
251 times
DOI :
https://doi.org/10.5614/jts.2017.24.3.7
-
Perbandingan Karakteristik Campuran Cold Paving Hot Mix Asbuton (CPHMA) yang Dipadatkan Secara Dingin dan Panas
Abstract views:
996 times
|
Downloaded:
731 times
DOI :
https://doi.org/10.5614/jts.2017.24.3.8
-
Maturitas Enterprise Risk Management Kontraktor Besar di Indonesia dan Faktor-Faktor yang Memengaruhinya
Abstract views:
370 times
|
Downloaded:
262 times
DOI :
https://doi.org/10.5614/jts.2017.24.3.9
-
Analisis Konsumsi Energi dan Emisi Gas Rumah Kaca pada Tahap Konstruksi Studi Kasus : Konstruksi Jalan Cisumdawu
Abstract views:
475 times
|
Downloaded:
340 times
DOI :
https://doi.org/10.5614/jts.2017.24.3.10



